Orders stay connected
BOM, route, work order, and operator signals stay in the same machine context.
INDUSTRIES
A live layer for long-cycle assembly, kitting, quality, and machine runoff.

Link purchased parts, machined parts, shortages, substitutions, and ERP stock to the active machine order.
Track mechanical build progress, operator confirmations, holds, and missing parts across every bay.
Connect wiring checks, panel status, software readiness, and PLC handover to the machine record.
Capture inspection, nonconformance, rework, and approval status without waiting for end-of-week reports.
Track safety checks, dry-run status, customer acceptance items, and final blockers before shipment.
See missing documents, open checks, packing status, and dispatch readiness before the machine leaves.
INTERACTIVE BUILD MAP
Codlean connects planning, kitting, assembly confirmations, electrical work, QA, and runoff status into one readable machine-builder view.
MACHINE-BUILDER LAYER
BOM, route, work order, and operator signals stay in the same machine context.
Missing parts, substitutes, and stock movements are visible before the bay stops.
Issues, rework, approvals, and runoff blockers remain tied to stage and reason.
Documentation, packing, final checks, and dispatch readiness are tracked before the handover date.
SIGNALS THAT MATTER
Expose shortages while there is still time to re-plan.
Assembly teams stop discovering blockers at the bay.See where long-cycle steps are slipping.
Leads act on the right order before the milestone moves.Connect final checks, rework, and acceptance items.
Runoff becomes a managed queue instead of a late scramble.WHAT TEAMS ASK FIRST
Quick answers for the first machinery production conversation.
Yes. The page is built around order-level context, long-cycle assembly stages, kitting, QA, and runoff status.
Start with the confirmations, checks, and ERP signals already used on the floor, then add only the missing live signals.
Usually in missing-part visibility, stage drift, quality blockers, and final runoff readiness.